Home » Option to Acquire High Pure Quartz Project in the Northern Territory

Option to Acquire High Pure Quartz Project in the Northern Territory

Option to Acquire High Pure Quartz Project in the Northern Territory

Highlights

Dingo Hole High Pure Quartz Project Highlights:

Dingo Hole High Pure Quartz Project

The Dingo Hole HPQ Project (EL31078) is located in the Georgina Basin, approximately 300km southeast of Tennant Creek (Figure 1). The project covers 35.16km2 and was subject to limited exploration by Rum Jungle Resources Limited (Rum Jungle, renamed to Verdant Minerals Limited) from 2012 to 2016.

In 2015, Rum Jungle conducted a mapping and rock chip sampling program across the Dingo Hole project. 30 of the Dingo Hole samples tested were found to contain greater than 99.94% SiO2 with only minimal sample preparation prior to assay (the samples were pre-leached with 20% Hydrofluoric acid at 60˚ for 4 hours and subsequently washed in Milli-Q water). While this is highly encouraging, it is the low levels of deleterious elements such as aluminium, titanium and lithium contaminants that highlight the project’s world-class potential (Figure 2). Nine of 30 ICP-SMS samples from Rum Jungle’s program contained less than the IOTA® standard for deleterious elements aluminium (Al) at 16.2ppm (16,200ppb), nearly all were better than the 200ppb (0.2ppm) IOTA® level for lithium (Li) and all were well below the 1.2ppm (1,200ppb) level for titanium (Ti).

source

Leave a Reply

Your email address will not be published.