Home » First Diamond Drilling Results at Ricciardo Deliver High-Grade Gold Extensions

First Diamond Drilling Results at Ricciardo Deliver High-Grade Gold Extensions

First Diamond Drilling Results at Ricciardo Deliver High-Grade Gold Extensions

HIGHLIGHTS:

This is the first diamond drill program at Ricciardo since 2014, when just three (3) diamond holes were drilled by the previous operator.

The results reported in this release are for four (4) (255m) of the 16 (1420m) diamond holes drilled to date. Approximately 2,200m of diamond drilling is planned as part of the current phase of combined RC and diamond drilling at Ricciardo and M1.

The results from these initial four diamond holes extend the high-grade shoot below the Silverstone North pit and infill a previous gap in the high-grade zone of the MRE below the northern part of the Ardmore pit (adding confidence and continuity to the MRE in this area).

These outcomes, while stemming from only a small part of the overall current phase of drilling, continues to demonstrate the outstanding MRE growth potential that exists at Ricciardo and along the broader ‘Golden Corridor’ trend.

The Ricciardo gold system (within the Golden Range Project) spans a strike length of approximately 2.3km, with very limited drilling having been undertaken below 100m depth. Ricciardo possesses a current Mineral Resource Estimate (MRE) of 8.7 Mt @ 1.7 g/t Au for 476 koz gold.1 The oxide material at Ricciardo has been mined by previous operators.

source

Leave a Reply

Your email address will not be published.