Home » Drilling Delivers 10.2m @ 2.3% CuEq, and DHEM Expands Further Potential in all Three Directions at Horden Lake

Drilling Delivers 10.2m @ 2.3% CuEq, and DHEM Expands Further Potential in all Three Directions at Horden Lake

Drilling Delivers 10.2m @ 2.3% CuEq, and DHEM Expands Further Potential in all Three Directions at Horden Lake

Highlights

Managing Director, Mr Fairhall said:

“Horden Lake continues to deliver – from both step-out, and infill from historical drilling. In the shallow areas, results indicate excellent continuity, in places widening, of expected mineralisation, along with a suite of valuable by-products which were overlooked in previous drilling.

Excitingly, deeper drilling and DHEM again combine to show excellent down plunge continuity of the deposit, and the huge potential for it to continue at depth. We now have a zone over 600m extending the mineralisation strike length that exhibits strong potential for expansive down-plunge extension with further drilling, potentially similar to that observed in the central zone which extends to over 490m vertical (and remains open).

Overview

Horden Lake is a copper dominant Cu-Ni-Au-PGM-Co Project located 131km north-northwest of Matagami, in Quebec Canada. The Project hosts an indicated and inferred mineral resource estimate of 28mt at 1.5% CuEq, as a result of over 52,464m of drilling previously completed on the property. Pivotal has recently completed a 7,097m / 34 hole diamond drilling campaign of which 1,800m / 9 holes have been reported prior to this announcement.

The objectives of the drilling program were to infill missing by-product multi-element assay information, target resource expansion potential (which remains open at depth across its full extent) and collect a distribution of metallurgical sample for a complete test work program. Downhole EM surveys have also been completed to dimension future exploration potential and targeting.

source

Leave a Reply

Your email address will not be published.