Intersection includes two distinct VMS lodes grading 15.5m @ 4.6% CuEq and 9.9m @ 5.8% CuEq above a broad copper FWZ intersection with a high-grade core of 27.6m @ 5.3% CuEq
Intersection includes an upper VMS lode grading 20.1m @ 6.1% CuEq above multiple FWZ intersections including 24.0m @ 2.6% CuEq and 11.0m @ 2.4% CuEq
FireFly Managing Director Steve Parsons said: “These exceptional new results highlight both the quality and ongoing growth potential at Green Bay.
”The results, which come from some of the deepest holes drilled to date, are world-class, demonstrating exceptionally high grades over huge true widths. They will be included in the next Resource update.
“The Resource remains open, and we will continue to add value through the drill bit by continuing to grow and infill what is already a high-grade and large-scale copper deposit”.
The results highlight the huge scope for ongoing growth in the Resource, which already stands at 59Mt @ 2% for 1.2Mt of contained copper metal equivalent.
These reported intersections were received after the October 2024 Resource update.
There are two distinct styles of mineralisation at the Ming underground mine at Green Bay. One comprises the upper copper-gold rich Volcanogenic Massive Sulphide (‘VMS’) lenses. This sits above a broad copper stringer zone known as the Footwall Zone (‘FWZ’).
Drilling at the margins of the current Resource show the development of a strong copper-rich footwall zone directly beneath the upper VMS lenses. In other parts of the deposit the separation of the VMS and FWZ can exceed 50 metres. Their convergence has resulted in thick and consistent high-grade copper and gold intersections which are amongst the best mineralised results returned from the deposit to date. Highlights include 86.3m @ 3.7% CuEq (~true thickness) made up of two separate VMS intersections of 15.5m @ 4.6% CuEq and 9.9m @ 5.8% CuEq above a thick FWZ mineralised zone with a core of 27.6m @ 5.3% CuEq.
Both the high-grade massive sulphide zones and broad footwall stringer zones remain open, with downhole geophysical surveys indicating probable extensions to the mineralisation pointing to future resource growth.
The Company will continue with its strategy of Resource growth at Ming with exploration development continuing to position drill rigs to deliver Resource growth during 2025. Four rigs continue to drill underground as part of the fully-funded 130,000m campaign designed to deliver both additional Resource extensions and infill drilling to increase confidence in the Inferred areas of the current estimate.
FireFly is well funded with ~A$88M in cash at the end of October 2024.
Leave a Reply