Home » Drilling Confirms Thick Copper Zone Continuity at Horden Lake

Drilling Confirms Thick Copper Zone Continuity at Horden Lake

Drilling Confirms Thick Copper Zone Continuity at Horden Lake

Highlights

Managing Director, Mr Fairhall said:

“Horden Lake delivers further confirmation of the wide zones of mineralisation indicative of the large, open-pittable copper project that has been defined on the project. The meaningful assays of palladium, gold, cobalt, platinum and silver, previously ignored, further reinforce the upside potential of this asset.

Logging and analysis continues, and we expect consistent news flow over the coming months as we release assays and downhole geophysics interpretations to target both grade and tonnage upside potential on the project.”

Overview

Horden Lake is a copper dominant Cu-Ni-Au-PGM-Co Project located 131km north-northwest of Matagami, in Quebec Canada. The Project hosts a 28mt at 1.5% CuEq indicated and inferred mineral resource estimate, as a result of over 52,464m of drilling already completed on the property. Pivotal has recently completed a 7,097m 34 hole diamond drilling campaign. 2 drill holes / 264m have been reported prior to this announcement.

The objectives of the drilling program were to infill missing by-product multi-element assay information, potentially expand the resource (which remains open at depth across its full extent), and collect a distribution of metallurgical sample for a complete test work program. Downhole EM surveys have also been completed to dimension future exploration potential and targeting.

Drill Hole Discussion

Holes HN-24-92 and HN-24-93 were designed to target gaps in the resource blocks, infill and add additional missing metals assay information. Table 1 contains significant intercepts, and Figure 2 is a longitudinal section showing the spatial distribution of historical and new drill hole pierce points.

source

Leave a Reply

Your email address will not be published.