Home » Further Assay Results from Link Zone Confirms Near- surface Mineralisation Across Multiple Lodes

Further Assay Results from Link Zone Confirms Near- surface Mineralisation Across Multiple Lodes

Further Assay Results from Link Zone Confirms Near- surface Mineralisation Across Multiple Lodes

Brightstar Resources Limited (ASX: BTR) (Brightstar) is pleased to announce further assay results from the Link Zone Reverse Circulation (RC) drilling program, part of the large RC and diamond drilling (DD) program across the broader 1.45Moz Brightstar portfolio. The program is targeting gold mineralisation within delineated pit shells and underground designs outlined within Brightstar’s Scoping Studies2,3 along with near-term development assessment of the Link Zone deposit comprising the Westralian Menzies, Merriyulah and Golden Dicks deposits.

The first phase of the RC drilling program at the Menzies Gold Project (MGP) has been completed, with the RC rig now drilling at the Second Fortune mine. Drilling at Menzies comprised infill drilling at the Link Zone deposits and the Lady Shenton System. Link Zone is located ~1km south of the 287koz Lady Shenton deposit and ~1km north of the 43koz Lady Harriet System.

The program at Link Zone was focused on areas within and adjacent to A$3,000/oz Au optimised pit shells to potentially upgrade mineralisation into the Measured & Indicated Mineral Resource Estimate (MRE) categories. Further technical studies will follow prior to a potential “Decision to Mine” on the development of a small-scale mining operation, similar to the successful campaign completed at the Selkirk deposit which generated $13 million in profits4.

source

Leave a Reply

Your email address will not be published.