Home » Quarterly Activities Report for the Period Ended 30 June 2024

Quarterly Activities Report for the Period Ended 30 June 2024

Quarterly Activities Report for the Period Ended 30 June 2024

HIGHLIGHTS

Golden Range and Fields Find Projects, Western Australia

Big Springs Project, Nevada

Corporate

Western Australian Projects

The Golden Range and Fields Find Projects (the Projects) are located approximately 350 km northeast of Perth and 260 km east-southeast of Geraldton (refer Figure 1). The total consolidated land package of the Projects is 788 km2, extending for over 70 km of strike from north to south and covering much of the central Yalgoo-Singleton and Warriedar Archean greenstone belts.

Total historical gold production from Golden Range and Fields Find was 350 koz, with the existing oxide plant placed on care and maintenance in August 2019.

The current JORC (2012) Mineral Resource estimate for Golden Range is 15.2 Mt at 1.7 g/t Au for 816 koz contained gold (of which 412 koz at 1.7 g/t Au sits in the Measured and Indicated classifications). For further Mineral Resource estimate details, refer to ASX release dated 28 November 2022.

source

Leave a Reply

Your email address will not be published.