Home » Further Strong Extensional Diamond Drill Results from Ricciardo

Further Strong Extensional Diamond Drill Results from Ricciardo

Further Strong Extensional Diamond Drill Results from Ricciardo

HIGHLIGHTS:

Warriedar Managing Director and CEO, Amanda Buckingham, commented:

“This final set of diamond results from the recent Ricciardo drilling have really put a bow on the whole program for us. The broad-based extensional success delivered by this drilling is both real and exciting. The fact that these results are being delivered at what are still relatively shallow down-dip depths, and in such proximity to excellent surrounding infrastructure, also delivers excellent potential for the economic character of the anticipated resource additions at Ricciardo. It is my firm belief that we are just getting started in terms of the opportunity at Ricciardo, let alone within the larger ‘Golden Corridor’ and along the broader mineralised shear.”

Key Ricciardo context

The Ricciardo gold system is located within Warriedar’s flagship Golden Range Project in the Murchison region of Western Australia (refer Figures 1 and 2).

Ricciardo spans a strike length of approximately 2.3km, with very limited drilling having been undertaken below 100m depth. It possesses a current MRE of 8.7 Mt @ 1.7 g/t Au for 476 koz gold. 1 Importantly, historical mining operations at Ricciardo were primarily focused on oxide material, with the transition and primary sulphides mineralisation not systematically explored.

The most recent phase of RC and diamond drilling of Ricciardo has concluded. This release reports on the assays from the final 11 holes of the diamond program. These holes were predominantly located in the southern part of the Ricciardo deposit, focusing on down-dip extension where no previous drilling had been undertaken (refer Table 1 and Figure 3 for drill collar and relevant section locations).

All 11 holes returned significant intersections, delivering a further round of meaningful extensional success from the recent program (refer Table 2). All results are set to be incorporated into an update of the Ricciardo MRE, which remains on track for completion during Q4 2024.

source

Leave a Reply

Your email address will not be published.